Consolidated Edison Company of New York the learning center header image

the learning center
course details

System Code: CCM0011
Title: Ccm Pre Const Prep
Topics Covered: Safe Work Practices and Procedures Setting Up the Project File Reviewing Layouts Ordering Materials Determining Required Permits Variances and Easements Reviewing Federal, State and City Regulations Required Reports and Forms Code 753 Angle of Repose Gas and Electric Clearance Mitigation Report Pre-construction Inspection of the Work-Site -Ethical Awareness -Questioning Mindset -Situational Awareness -The Rules We Live By -Job Briefing
Outcome: Participants will be able to prepare and inspect the pre-construction work site and identify conditions that affect work progress. CRITICAL CONSEQUENCES (C2) 1.CAST IRON ANGLE OF REPOSE: Failure to recognize the hazard associated with cast iron located within the angle of repose could result in injury, death and/or property damage. 2. ENGINEERING DRAWINGS: Failure to master the interpretation of engineering drawings, documents and Company Maps could result in possible injury, death and/or property damage. "Ethical Awareness" is integrated into program modules to maintain ethical behavior and enhance the students understanding of our Corporate Values.
Class Size 8
Duration (days): 2
Audience: Private sector customers involved in monitoring construction projects, Construction Management field employees, Maintenance and Construction Mechanics A
  Search by keyword:




contact   |   search   |   careers   |   site map   |   consolidated edison, inc.   |   privacy policy